When I was 6 years old all I wanted was a swimming pool. I didn't want much. Just a "large" above ground pool from the JC Penney catalog. When that summer catalog came I would go right to the sporting goods page. Two pages of above ground pools - ranging from 6 feet wide rounds to 10 by 6 foot ovals - coming complete with a pump and filter and ladder. My sister and I spent hours planning. It would fit right where our swingset and play yard currently resided. All we needed to do was to talk our parents into spending about $600. We took measurements. We could fit a 6 x 10 oval, but in the interest of economy, an 8 foot round would do just fine. We pleaded, we cajoled; all to no avail. It just wasn't in the budget. We lived close to many lakes. They just didn't see the need for water, easily accessable in the back yard.
Cut to 30 years later. I (along with my husband) was a home owner. With a backyard big enough for the pool. Of course the price was now about $2000 and we would need to cut down the two big shade trees in our yard to have the water, easily accessable, in the backyard. It wasn't happening.
Another 10 years passed. We now lived in California where "everybody" had pools. Our yard was too rocky to install an inground without blasting. "So what?" I argued, "It's only about $20,000." "We'd wind up cracking the foundation of the house!" replied The Bearded One. We compromised on a used above ground pool kit ($100) with a concrete pool pad to discourage burrowing animals ($3000) and a new ladder and liner ($300). We filled the pool and prepared to enjoy.
Except I was now too old to enjoy the brisk, cool water. My ankles ached, my knees ached. We had a pool, YES! But even in Southern California only used it a few weeks of the year, NOOOooooo!
Fast Forward another 10 years. On the orignal concrete pad we have a pool with an R-10 wall, a solar cover and two solar heaters. The pool is over 90 (it has hit 98 several times this week) degrees and is essentially just a really large hot tub. I use it every day - to swinm in the early morning (in a harness for fitness) and in the evening to cool off (hah!) after a long day.
Just what I always wanted.....
even better than the Camaro I waited 16 years to get - because the water would have ruined the upholstery.
-Special thanks to The Bearded One for editorial assistance
Showing posts with label Do It Yourself. Show all posts
Showing posts with label Do It Yourself. Show all posts
Monday, July 4, 2011
Wednesday, June 29, 2011
For a Few Dollars More
It was only a year and a half ago that we got rid of our fourth vehicle, "The Green Monster". Green Monster was a Ford Aerostar XL which had served us long and nobly while we renovated the house; transporting stone and brick and all manner of timbers and tile. Not to mention paint, toilets, and mortar. But the renovation was finished. We had 4 vehicles for 3 people and the insurance was expensive...
This last weekend we bought a "new" used vehicle. We had need for a fourth vehicle again...it is a dark green 2000 Volvo S80. Once a really high end car, it is now a plucky oldster soldiering on amidst the ravages of time and little people: Its 4 disc CD player jammed with WAY TOO MANY CD's and the back side window shades missing their trim. It is a well travelled vehicle, having begun service in Washington State, then moving to the San Francisco Bay area, then on to Hawaii and finally, back to California, but in the south of the state this time.
The engine and drive train are in really good shape, we were told. It was sold "As Is" we were told. We knew what that meant.
We wrote our check for a ridiculously small amount and drove directly to Discount Tire to replace all four tires, none of which were street legal. Then the work began: The owners manual was downloaded, printed, punched and 'notebooked". Goo Gone and a razor blade took care of the leftover glue from the decals that had been pasted over the headlights. Saddle soap reconditioned the worn leather seats. Burned out tail light bulbs were replaced. Floor mats were purchased to replace the non-existant ones. The windshield washer reservoir was refilled (only to find that there was a missing connector to the hose feeding the washer nozzles - the engine compartment has now been thoroughly washed). A battery in the second remote was replaced - now we have two working remotes. Other parts are on order (new headlight wiper assemblies, washer nozzle, rearview mirror...).
Thank goodness we (The Bearded One) have/(has) the ability to take care of all of the little things...
Thank goodness we have the funds to take care of all of the little things that will allow the "new" vehicle to serve long and well for many more miles.
LONG LIVE "LILYPAD"!
This last weekend we bought a "new" used vehicle. We had need for a fourth vehicle again...it is a dark green 2000 Volvo S80. Once a really high end car, it is now a plucky oldster soldiering on amidst the ravages of time and little people: Its 4 disc CD player jammed with WAY TOO MANY CD's and the back side window shades missing their trim. It is a well travelled vehicle, having begun service in Washington State, then moving to the San Francisco Bay area, then on to Hawaii and finally, back to California, but in the south of the state this time.
The engine and drive train are in really good shape, we were told. It was sold "As Is" we were told. We knew what that meant.
We wrote our check for a ridiculously small amount and drove directly to Discount Tire to replace all four tires, none of which were street legal. Then the work began: The owners manual was downloaded, printed, punched and 'notebooked". Goo Gone and a razor blade took care of the leftover glue from the decals that had been pasted over the headlights. Saddle soap reconditioned the worn leather seats. Burned out tail light bulbs were replaced. Floor mats were purchased to replace the non-existant ones. The windshield washer reservoir was refilled (only to find that there was a missing connector to the hose feeding the washer nozzles - the engine compartment has now been thoroughly washed). A battery in the second remote was replaced - now we have two working remotes. Other parts are on order (new headlight wiper assemblies, washer nozzle, rearview mirror...).
Thank goodness we (The Bearded One) have/(has) the ability to take care of all of the little things...
Thank goodness we have the funds to take care of all of the little things that will allow the "new" vehicle to serve long and well for many more miles.
LONG LIVE "LILYPAD"!
Labels:
Do It Yourself,
Money,
Rememberies,
Stress,
Vehicles
Monday, May 9, 2011
Because it's what I do best...
Guilt. Ah, that wonderful, all powerful tool that is so useful in the home. I didn't have to get it out even once this last Mother's Day weekend. What a shame, as I had it all perfectly polished up and ready to go...
Did I get the perfect card? No.
Did I get to sleep in? No.
Did I get breakfast in bed? No.
Instead I got the gift of a guilt-free construction project. Perfect!
When we had to cover the pond to prevent the ravages of predator birds, the canvas top did nothing to improve the health of the waterplants. We have been planning to replace the canvas with a redwood lattice roof for a couple of years now, but that project always seems to come in second to more pressing needs.
This year, it was announced that The Bearded One and Stubble were going to begin on the new roof for the pond enclosure - without my even asking! How nice! A construction project in which I have no part to play except for spray painting the joist hangers gloss black.
It is going to look absolutely awesome. Of course, it is going to take about 3.1416 times as long to finish as they had planned.....
Did I get the perfect card? No.
Did I get to sleep in? No.
Did I get breakfast in bed? No.
Instead I got the gift of a guilt-free construction project. Perfect!
When we had to cover the pond to prevent the ravages of predator birds, the canvas top did nothing to improve the health of the waterplants. We have been planning to replace the canvas with a redwood lattice roof for a couple of years now, but that project always seems to come in second to more pressing needs.
This year, it was announced that The Bearded One and Stubble were going to begin on the new roof for the pond enclosure - without my even asking! How nice! A construction project in which I have no part to play except for spray painting the joist hangers gloss black.
It is going to look absolutely awesome. Of course, it is going to take about 3.1416 times as long to finish as they had planned.....
Sunday, November 7, 2010
Dust
This weekend was fun, Fun, FUN! We started putting the office and family room back together...which requires a little history. While the couch and TV have been up and running and the exercise equipment functional (but generally unused) and the computer that is our house server has of necessity been running 24/7, the books have been in boxes in a storage unit for much of the last 5 years. It all started with the painters telling us to "pack as if we were moving" and then get out..so we did.
As Stubble says, "Mom and Dad, you keep WAY TOO MANY books!" And we do. Once we own a book it is ours forever. It is a beloved friend and we will make a place for it in our lives forever....and that is pretty much not an exageration. We occasionally take books to Friends of the Library if we hated reading them or if we have no more space, but today we boxed up many of our "friends". We unpacked 10 cartons of books that were dusty and dirty and are actually preaparing to send 2 cartons of them away....and it was tough. Both the letting go and the dust.
I have had 2 showers during the course of the day because of my dust allergies. But the bookcases are now full and the room looks ready to live in.
As Stubble says, "Mom and Dad, you keep WAY TOO MANY books!" And we do. Once we own a book it is ours forever. It is a beloved friend and we will make a place for it in our lives forever....and that is pretty much not an exageration. We occasionally take books to Friends of the Library if we hated reading them or if we have no more space, but today we boxed up many of our "friends". We unpacked 10 cartons of books that were dusty and dirty and are actually preaparing to send 2 cartons of them away....and it was tough. Both the letting go and the dust.
I have had 2 showers during the course of the day because of my dust allergies. But the bookcases are now full and the room looks ready to live in.
Labels:
Do It Yourself,
Hoarding,
Home Improvement,
Rememberies
Wednesday, November 3, 2010
Instead of Blogging
Since I wrote my “Hurrying Up” post, I began prepping flooring non-stop. It is amazing how long it takes to get everything ready for carpet installation. Because nobody would tell us exactly what they wanted us to do to get the floor prepped (I suppose that they wanted to do the prep, but we expected the damage under the carpet would be huge and didn’t want to pay for a project of that magnitude done by a professional carpenter). The Bearded One went to a DIY website and downloaded instructions.
We needed to pull all staples and scrape up all glue. And then make sure that there were no gaps in the subfloor to cause excessive wear in scattered places in the new carpet. I understand that you are supposed to glue the carpet pad, and then staple only on stair treads but our carpet was BOTH glued and stapled and stapled and stapled and stapled some more. Everywhere but on the concrete slab in the family room. And that slab? It had animal paw prints in the concrete…ah well it must be those pesky beer bottles again.
I filled all of the gaps between the sub floor boards and then I painted on several coats of Kilz and then realized that I hadn’t removed the baseboards. After they were off there was drywall to repair…dang. I cannot recommend a Dremel Multi-Max highly enough. After the Kilz , more staples showed up on the clean white paint. In fact, I was still pulling staples the morning of the scheduled installation. Which was still incomplete 2 weeks later because the Mill shipped the wrong carpet.
Which brings me to a recommendation that I cannot stress too strongly: When you are purchasing carpet don’t just take a little sample. We bought a 1 foot wide 12 foot long sample and it has saved us a tremendous amount of heartache and expense. The carpet that was sent was very close in color to what we had ordered, but the quality was not right and if we hadn’t had that large sample so that it was evident to everyone, we might have had 5 -7 year carpet rather than 15 year carpet…..
The above was written on Thursday, September 2nd. It is now November 3rd. In the meantime, the Carpet Mill sent replacement carpet and SURPRISE! It was the same as the first carpet that they sent…obviously they have changed the spec for the carpet and it is not at all what we would want in our home. Home Depot has been wonderful in backing us up. When seeing the sample that we originally ordered and what we received from the Mill they went to the manufacturer to complain for us. Then they arranged for us to choose completely different carpet from a different manufacturer. We waited for two more samples and had to reorder carpet and wait for installation. At least the measurements are already taken! We still had our home entertainment center torn apart, all excess furniture was stored in the guest room (which you can’t walk across). The correct carpet finally arrived and was installed on October 29th and we are now in the process of putting the house back together. I can’t believe that this has taken so long!
We needed to pull all staples and scrape up all glue. And then make sure that there were no gaps in the subfloor to cause excessive wear in scattered places in the new carpet. I understand that you are supposed to glue the carpet pad, and then staple only on stair treads but our carpet was BOTH glued and stapled and stapled and stapled and stapled some more. Everywhere but on the concrete slab in the family room. And that slab? It had animal paw prints in the concrete…ah well it must be those pesky beer bottles again.
I filled all of the gaps between the sub floor boards and then I painted on several coats of Kilz and then realized that I hadn’t removed the baseboards. After they were off there was drywall to repair…dang. I cannot recommend a Dremel Multi-Max highly enough. After the Kilz , more staples showed up on the clean white paint. In fact, I was still pulling staples the morning of the scheduled installation. Which was still incomplete 2 weeks later because the Mill shipped the wrong carpet.
Which brings me to a recommendation that I cannot stress too strongly: When you are purchasing carpet don’t just take a little sample. We bought a 1 foot wide 12 foot long sample and it has saved us a tremendous amount of heartache and expense. The carpet that was sent was very close in color to what we had ordered, but the quality was not right and if we hadn’t had that large sample so that it was evident to everyone, we might have had 5 -7 year carpet rather than 15 year carpet…..
The above was written on Thursday, September 2nd. It is now November 3rd. In the meantime, the Carpet Mill sent replacement carpet and SURPRISE! It was the same as the first carpet that they sent…obviously they have changed the spec for the carpet and it is not at all what we would want in our home. Home Depot has been wonderful in backing us up. When seeing the sample that we originally ordered and what we received from the Mill they went to the manufacturer to complain for us. Then they arranged for us to choose completely different carpet from a different manufacturer. We waited for two more samples and had to reorder carpet and wait for installation. At least the measurements are already taken! We still had our home entertainment center torn apart, all excess furniture was stored in the guest room (which you can’t walk across). The correct carpet finally arrived and was installed on October 29th and we are now in the process of putting the house back together. I can’t believe that this has taken so long!
Thursday, July 15, 2010
Hurrying Up
We are the slowest possible remodelers. Well, there are probably folks who are slower than we are but we are certainly in the lowest portion of the 25th percentile. Partly it is because we “enjoy” doing things ourselves. As The Bearded One says, “I get such a wonderful feeling of satisfaction when we finish.”
Yes, that is true, but when the whole house fan is already 2 years off warranty when it is finally installed – there is something wrong. The first thing that is wrong is that we are busy people who have other things going on in life in addition to home improvement. We occasionally take a vacation, or meet friends, or go shopping, or oddly enough just want to enjoy a day at the beach. The other problem is that we aren’t getting any younger. If we work constantly on the house for long days, we would be permanently crippled. When we were younger we could tote and haul and strain for days on end, now after 4 or 5 or 10 floor tiles, The Bearded One’s back is screaming for mercy and Advil. If I have been sanding and scraping and sanding yet again, my hands and forearms will be completely useless for a day when it comes to things like removing jar lids or holding heavy objects like milk jugs.
But now we have a reason to move ahead swiftly. We have adoptive kitties waiting for the OK to come live at our house. One of Stubble’s friends has a cat that got out of the house before it could be spayed, with predictable results. The family doesn’t want to just drop the kitties off at the Humane Society. They would like to personally approve the adoptive families. We have been a ‘cat free home” for almost 2 years now and it is tough when you are feeling under the weather not to have a purring cat plastered to your back (or head, or feet). We readily agreed to accept two of the kittens. We just needed to get the floors done (old carpet ripped out, subflooring repaired and sealed).
Last weekend we rented a dumpster and Stubble and two of his friends and I removed all of the old carpet. We discovered less damage than we had expected, but need to remove 2 of the stairway landings. The first one was removed last Sunday and when the wood was removed an empty beer bottle dating back to 1971 was discovered – which explains SO MUCH about the things we find in our house as we remodel. Like the subflooring that completely missed a joist (but that is another story).
The family from whom we are adopting has graciously kept “our” kittens until the floor can be sealed but the kittens were ready to come to our house several weeks ago. And the temperatures are getting hotter. And the work we have to do must be done with the windows open. And The Bearded One had the temerity to suggest that maybe we should close up the house and turn on the air conditioning and just forget about paint this weekend….
So I am taking a vacation day tomorrow so that I can begin sealing the floors with Kilz at 6 AM…I can get a couple of coats on before we need to chill the house!
Yes, that is true, but when the whole house fan is already 2 years off warranty when it is finally installed – there is something wrong. The first thing that is wrong is that we are busy people who have other things going on in life in addition to home improvement. We occasionally take a vacation, or meet friends, or go shopping, or oddly enough just want to enjoy a day at the beach. The other problem is that we aren’t getting any younger. If we work constantly on the house for long days, we would be permanently crippled. When we were younger we could tote and haul and strain for days on end, now after 4 or 5 or 10 floor tiles, The Bearded One’s back is screaming for mercy and Advil. If I have been sanding and scraping and sanding yet again, my hands and forearms will be completely useless for a day when it comes to things like removing jar lids or holding heavy objects like milk jugs.
But now we have a reason to move ahead swiftly. We have adoptive kitties waiting for the OK to come live at our house. One of Stubble’s friends has a cat that got out of the house before it could be spayed, with predictable results. The family doesn’t want to just drop the kitties off at the Humane Society. They would like to personally approve the adoptive families. We have been a ‘cat free home” for almost 2 years now and it is tough when you are feeling under the weather not to have a purring cat plastered to your back (or head, or feet). We readily agreed to accept two of the kittens. We just needed to get the floors done (old carpet ripped out, subflooring repaired and sealed).
Last weekend we rented a dumpster and Stubble and two of his friends and I removed all of the old carpet. We discovered less damage than we had expected, but need to remove 2 of the stairway landings. The first one was removed last Sunday and when the wood was removed an empty beer bottle dating back to 1971 was discovered – which explains SO MUCH about the things we find in our house as we remodel. Like the subflooring that completely missed a joist (but that is another story).
The family from whom we are adopting has graciously kept “our” kittens until the floor can be sealed but the kittens were ready to come to our house several weeks ago. And the temperatures are getting hotter. And the work we have to do must be done with the windows open. And The Bearded One had the temerity to suggest that maybe we should close up the house and turn on the air conditioning and just forget about paint this weekend….
So I am taking a vacation day tomorrow so that I can begin sealing the floors with Kilz at 6 AM…I can get a couple of coats on before we need to chill the house!
Labels:
Cats,
Do It Yourself,
Home Improvement,
Pets
Friday, June 11, 2010
Another Tale of Home Improvement
We bought the house with eyes wide open. It had been a rental property for 10 years, we were told. It had recently been “fixed up to sell” by the current owner who had bought it as an investment property. It was larger than anything that I had yet seen in California and we could afford it. And best of all, it had CLOSETS. Lots of closets. And big rooms. Some of the newer homes that I had been shown that were in our price range and were available to rent until closing were less than exciting.
One was a three bedroom, two bath home where one of the two bedrooms on the second floor had no bathroom access….one was lovely but had no usable yard…one had a bedroom with no closet and tiny, tiny rooms. We were coming from a 1200 square foot house with a full furnished basement. Meaning that we had 2400 square feet of “stuff” to move into our new place.
We knew that “fixed up to sell” meant that they had installed the cheapest possible carpet and that the “fresh paint” was probably not really high quality, but we wanted the square footage, the closets, the under house storage, the large attic, and decently sized rooms; so we signed on the dotted line and moved in.
Things held up pretty well for the first 10 years. We found out that there was a hole in the laundry room floor when a corner of the dryer fell through it, and sealing the asphalt driveway was an issue as the crumbling drive seemed to absorb the sealer like a sponge but it was no big deal. Following a scary wildfire, the shake roof was redone with something fire resistant. The garbage disposal finally blew its fuse for the last time and was replaced, but for the most part things were OK and we could live with it. Then at 10 years, we decided that we wanted to change a few things and the major renovation began.
Those of you who lived through the 70’s know the beauty that is “Mediterranean Style”. For those of you who don’t know, Google it, or just think DARK and ORNATE. We had been Home Depot dreaming for years, selecting which (light, simple) cabinets we would install and what color countertop we would like. When we got the contractor’s estimate for replacing the kitchen cabinets we were stunned. The entire budget for a new driveway, deck, and kitchen would be eaten up by the kitchen alone! When we recovered a bit from the shock, the contractor told us that refinishing the cabinets was an option also. When we found out that cost we decided to replace the back deck and the driveway and to tackle the kitchen ourselves.
Our original decision was to replace countertop and appliances and the cabinet hardware and just update a bit. That was affordable, that was doable. Then I fell in love with a black granite look laminate countertop. It would be WAY too dark for the existing finish on the cabinets, but WAIT! If “I” refinish them, maybe I can lighten the color enough that the countertop will look OK. We had planned on stainless steel appliances and had ordered a new dishwasher in stainless, but had cancelled the order when unexpected expenses came up. Which turned out to be a GOOD thing, because when I began the process of stripping the old varnish, what emerged was beautiful , heavily grained Red Oak. Stainless looked AWFUL with it, but black appliances were just the ticket. And the black countertop? Um, not a good match with the final cabinet color, but another granite-appearing salmon pinkish/rose with dark gray flecks, oddly enough called “Mesa Gold”, looked just right.
I had the casework stripped and re-varnished within 6 weeks, but then we were without doors on the cabinets for a couple of years as I stripped and refinished them in and around other projects and necessities of life, like doing laundry and cooking. Luckily we were able to find new hinges in the exact same style as the old ones, and found pulls that were exactly what we wanted (simple, solid antique brass). We found a double convection oven at a warehouse sale that was priced just perfectly, and the most expensive “appliance” in the kitchen turned out to be the big, black, Kohler sink and faucet assembly.
What I have learned from this experience is that for do it yourselfers, sometimes slow and steady is the way to go because your taste will change over time and once you have it all installed is not the time to decide that you have made the wrong color choices!
And that beautiful, Red Oak? When the cabinets were installed (40 years ago), they were put up, hardware was installed, and the black lacquer varnish was slapped over the entire cabinet, hinges and all. There was no stain on the cabinets under the hinges. Oh MY! There are many more shortcuts that the contractor took when building our house which will be the subject of future Home Improvement Tales.
One was a three bedroom, two bath home where one of the two bedrooms on the second floor had no bathroom access….one was lovely but had no usable yard…one had a bedroom with no closet and tiny, tiny rooms. We were coming from a 1200 square foot house with a full furnished basement. Meaning that we had 2400 square feet of “stuff” to move into our new place.
We knew that “fixed up to sell” meant that they had installed the cheapest possible carpet and that the “fresh paint” was probably not really high quality, but we wanted the square footage, the closets, the under house storage, the large attic, and decently sized rooms; so we signed on the dotted line and moved in.
Things held up pretty well for the first 10 years. We found out that there was a hole in the laundry room floor when a corner of the dryer fell through it, and sealing the asphalt driveway was an issue as the crumbling drive seemed to absorb the sealer like a sponge but it was no big deal. Following a scary wildfire, the shake roof was redone with something fire resistant. The garbage disposal finally blew its fuse for the last time and was replaced, but for the most part things were OK and we could live with it. Then at 10 years, we decided that we wanted to change a few things and the major renovation began.
Those of you who lived through the 70’s know the beauty that is “Mediterranean Style”. For those of you who don’t know, Google it, or just think DARK and ORNATE. We had been Home Depot dreaming for years, selecting which (light, simple) cabinets we would install and what color countertop we would like. When we got the contractor’s estimate for replacing the kitchen cabinets we were stunned. The entire budget for a new driveway, deck, and kitchen would be eaten up by the kitchen alone! When we recovered a bit from the shock, the contractor told us that refinishing the cabinets was an option also. When we found out that cost we decided to replace the back deck and the driveway and to tackle the kitchen ourselves.
Our original decision was to replace countertop and appliances and the cabinet hardware and just update a bit. That was affordable, that was doable. Then I fell in love with a black granite look laminate countertop. It would be WAY too dark for the existing finish on the cabinets, but WAIT! If “I” refinish them, maybe I can lighten the color enough that the countertop will look OK. We had planned on stainless steel appliances and had ordered a new dishwasher in stainless, but had cancelled the order when unexpected expenses came up. Which turned out to be a GOOD thing, because when I began the process of stripping the old varnish, what emerged was beautiful , heavily grained Red Oak. Stainless looked AWFUL with it, but black appliances were just the ticket. And the black countertop? Um, not a good match with the final cabinet color, but another granite-appearing salmon pinkish/rose with dark gray flecks, oddly enough called “Mesa Gold”, looked just right.
I had the casework stripped and re-varnished within 6 weeks, but then we were without doors on the cabinets for a couple of years as I stripped and refinished them in and around other projects and necessities of life, like doing laundry and cooking. Luckily we were able to find new hinges in the exact same style as the old ones, and found pulls that were exactly what we wanted (simple, solid antique brass). We found a double convection oven at a warehouse sale that was priced just perfectly, and the most expensive “appliance” in the kitchen turned out to be the big, black, Kohler sink and faucet assembly.
What I have learned from this experience is that for do it yourselfers, sometimes slow and steady is the way to go because your taste will change over time and once you have it all installed is not the time to decide that you have made the wrong color choices!
And that beautiful, Red Oak? When the cabinets were installed (40 years ago), they were put up, hardware was installed, and the black lacquer varnish was slapped over the entire cabinet, hinges and all. There was no stain on the cabinets under the hinges. Oh MY! There are many more shortcuts that the contractor took when building our house which will be the subject of future Home Improvement Tales.
Labels:
Do It Yourself,
Home Improvement,
Real Estate
Wednesday, May 12, 2010
A Tale of Home Improvement
One. Little. Nail. Just one. “Honey, why don’t you pull that nail out of the drywall before we install the sink?”
We are installing a utility sink in the garage. For the years long renovation of the house, we have been using the large, black, (expensive), Kohler kitchen sink to clean paint brushes, and mix thinset and grout. Anything nasty that we need to do involving water has happened in that sink. So now, with only the kitchen floor left to tile, why on earth is a utility sink suddenly a necessity? I suppose, because it is a way to delay the installation of the HardieBacker for another week. No, not really. It is so when the tile goes into the kitchen, we have access to water in a sink big enough to fill a pot and wash a dish.
There was a plan. It was to get the corner of the garage where the sink would reside cleaned out, get all materials, and prep in advance so the installation would take about 3 hours and then the rest of the weekend could be devoted to backer board. Well, as with most plumbing projects, 3 hours proved to be a wildly optimistic estimate.
I kept to the plan. I took a couple of hours of vacation time to clear out the garage. It was quality time well spent with a trash can. Why on earth did we keep boxes of old cassette tapes that we haven’t listened to in nearly 20 years? Couldn’t tell you, but they are gone now. As are the 7 empty wine boxes we were saving for some unknown reason. I forced a midweek trip to Home Depot to purchase the sink, faucet, ABS pipe, new glue, 90 ° elbows, 45 ° elbows, copper pipe, shut off valves, solder, and couplings. We were all set to go first thing Saturday morning.
Our house is built into a hillside so that the main floor is at ground level in the front; there is an upper floor above the garage that houses the master bedroom suite, and a family room and half bath that open into the backyard on a lower floor. Under most of the house is standing headroom so that running new pipes is relatively easy; it isn’t like you have to tear up concrete or anything…
So, I suggested that the protruding nail be removed. It has been there since we purchased the house 18 years ago and when valuable household items were piled in front of it, I never noticed. But now that there would be a sink right there, it made sense to pull out the useless nail. So The Bearded One pulled the nail out and A STREAM OF WATER BEGAN TO SHOOT OUT OF THE WALL! ARRRGHHH!
Drywall removal was quickly accomplished with a Dremel Multi-Max (if you don’t own one, you should), soggy insulation was pulled out and it turned out that the nail had penetrated the trap in the washing machine drain.
We now have a 2’ x 2’ hole in that garage wall that is being “left open to dry”. There has been a new trap installed for the washer drain. The sink is in place and functional. Our son, Stubble, learned a lot about plumbing including how much fun a Bernzomatic torch can be. And it only took 6 additional trips to Home Depot to accomplish the job. Total time on the job: about 10 hours.
Next job: Patching the drywall. But that will be another Tale.
We are installing a utility sink in the garage. For the years long renovation of the house, we have been using the large, black, (expensive), Kohler kitchen sink to clean paint brushes, and mix thinset and grout. Anything nasty that we need to do involving water has happened in that sink. So now, with only the kitchen floor left to tile, why on earth is a utility sink suddenly a necessity? I suppose, because it is a way to delay the installation of the HardieBacker for another week. No, not really. It is so when the tile goes into the kitchen, we have access to water in a sink big enough to fill a pot and wash a dish.
There was a plan. It was to get the corner of the garage where the sink would reside cleaned out, get all materials, and prep in advance so the installation would take about 3 hours and then the rest of the weekend could be devoted to backer board. Well, as with most plumbing projects, 3 hours proved to be a wildly optimistic estimate.
I kept to the plan. I took a couple of hours of vacation time to clear out the garage. It was quality time well spent with a trash can. Why on earth did we keep boxes of old cassette tapes that we haven’t listened to in nearly 20 years? Couldn’t tell you, but they are gone now. As are the 7 empty wine boxes we were saving for some unknown reason. I forced a midweek trip to Home Depot to purchase the sink, faucet, ABS pipe, new glue, 90 ° elbows, 45 ° elbows, copper pipe, shut off valves, solder, and couplings. We were all set to go first thing Saturday morning.
Our house is built into a hillside so that the main floor is at ground level in the front; there is an upper floor above the garage that houses the master bedroom suite, and a family room and half bath that open into the backyard on a lower floor. Under most of the house is standing headroom so that running new pipes is relatively easy; it isn’t like you have to tear up concrete or anything…
So, I suggested that the protruding nail be removed. It has been there since we purchased the house 18 years ago and when valuable household items were piled in front of it, I never noticed. But now that there would be a sink right there, it made sense to pull out the useless nail. So The Bearded One pulled the nail out and A STREAM OF WATER BEGAN TO SHOOT OUT OF THE WALL! ARRRGHHH!
Drywall removal was quickly accomplished with a Dremel Multi-Max (if you don’t own one, you should), soggy insulation was pulled out and it turned out that the nail had penetrated the trap in the washing machine drain.
We now have a 2’ x 2’ hole in that garage wall that is being “left open to dry”. There has been a new trap installed for the washer drain. The sink is in place and functional. Our son, Stubble, learned a lot about plumbing including how much fun a Bernzomatic torch can be. And it only took 6 additional trips to Home Depot to accomplish the job. Total time on the job: about 10 hours.
Next job: Patching the drywall. But that will be another Tale.